up_and_up
Joined 15 years ago
Joined 15 years ago
Based on how time is being spent that sounds an awful lot like an EM role to me?
Like EM responsibilities minus actual humans reporting to you?
You could save time by simply reading and distilling this blog post: https://www.ricklindquist.com/notes/the-first-90-days
This is the route: https://www.mountainproject.com/route/106261545/freerider
30 pitches at 5.13a.
That is very very difficult.
Keep in mind:
1. Very few climbers can even climb one pitch of 5.13 (maybe top 1%)
2. Even fewer could attempt 30 pitches of 5.13 over several days.
3. Like maybe only dozens in the world could attempt 30 pitches of 5.13 in single day
4. Only 1 person ever in history that has attempted that without a rope.
Not always at medium-big startups. It is fixed depending on the position.
I have worked at like 6 different companies now from 20-1400 people. Smaller companies definitely have some flexibility but its usually a cash vs equity conversation.