svggrfgovgf
Joined 4 years ago
Joined 4 years ago
(photos of ADM-3A at http://dunfield.classiccmp.org/altair/altair5.htm It has 24 lines of 80 characters with green text on black background plus some graphics characters which could be used to draw pictures.)
"Large or Complex Projects - extensive curb modifications or custom installations can cost $1,200-$3,000 or more. These projects often involve additional planning, permits, or structural considerations, which can increase overall costs. Many jobs are completed within the lower part of this range.
Full Replacement - complete curb or sidewalk replacements typically start around $3,000 and can exceed $5,000 for larger, more involved projects. These are less common and usually reserved for significant repairs or upgrades, with most projects falling into the lower to mid portions of this range."
I think the idea had a lot of merit, but have never seen it in practice.
If those launches go on schedule, that will mean 4 launches (New Glenn, Atlas 5, and two Falcon 9s) in 31 hours from the Cape Canaveral area in Florida.
'Acceleration without fuel:' Revolutionary superconducting thruster harnesses Earth's magnetic field in 1st orbital test