One nice thing though is many of the stability services (such as balancing frequency) can be detected locally and therefore centralised dispatch and comms aren't necessary. All of our household systems have high speed metering attached (sampling at 20hZ) and when they make a frequency measurement outside the normal operating range (48.8Hz - 50.2Hz) they discharge/charge respectively. This means that when there's an event we have all the systems reacting in a way that looks coordinated, but is actually just syncronised (as they all essentially have the same input -- grid frequency), so services like this are extremely resilient.
Here's one of our plants in Canberra which is past 3MW now, and is the first of its kind to be approved to bid into our fast frequency stability markets (where you have less than a couple of seconds to respond). https://www.youtube.com/watch?v=36UJMuC9-k0
I don't meant to suggest that plants could ramp full within 60 seconds, it's that 4GW means there's a bunch of headroom, and that there was at least the physical possibility that dispatch instructions to increase generation/start-up (the reserves were "available") could have been sent out and plants could have started moving on an upward trajectory, creating even a few extra hundred MW of generation if many of the more flexible plants (gas, hydro) could increase their output even just a bit.
Here in Australia we dispatch on a 5 minute period, and there are some plants that are very slow moving and have to ramp over tens of minutes or hours, but moving grid-wide generation up and down many hundreds of MW within a 5 minute dispatch period is a common occurrence, and so this coupled with the relatively high amount of reserve makes me suspect it would have at least been physically possible to increase output and hasten the return to a normal operating frequency.
How you create both the systems and market structures/rules to oversee dispatch and coordination of something like that in a fast and automated way is very complex and infeasible to effectively do any time soon, but I think it's a system we should be thinking about and moving towards.
Overall though I'm just grumpy about the amount of manual, slow work that's still involved in grid operations (when we lose an inter-connector here in Australia it takes 3-15 minutes for the dispatch engine to become aware that there's no inter-connector anymore as it needs to be reconfigured manually).