mbalyuzi
Joined 6 years ago
Joined 6 years ago
In this instance, this was not the case. There was power distributed along the train as it was composed of many powered units coupled together.
They point out that offering v4 as a separate line item leads to conversations with accountants about "what's this line item, and do you actually need it?"
I imagine Sheffield University are stuck with them, there simply isn't enough space in the building core for conventional lifts to meet the requirement to move a lot of students up and down the building in the short space of time between lectures. I do remember the conventional lifts being quite big, but with long waits.
There seems to be a bit of a "We're the government, so they'll have to do what we ask/tell" going on here I suspect. Probably coupled with incompetent IT project management that didn't bother to worry about the terms and conditions they signed up to, because that was too hard.