https://d1n1o4zeyfu21r.cloudfront.net/WEB_Incident_%2028A_Sp...
You can still find books that use the same approach and covers more.
Engineering grid and PV installations acknowledge that the generation may be lost, so you are having contingency plan by means of transferring or picking the load. You're going to lose power for short time if you didn't do this properly.
Actually due to the nature of PV generation, no sun no generation, it is reckless to just rely on PV. If sun is shining that is great, there'll be generation. However, daily peak consumption coincides with less day light. So during planning the target is the extreme cases (statistically estimating demand), in other words you do load flow studies for extreme cases. This helps to see your capacity limits.
In parallel to this you should consider electric grid as a layered system. PV generation at house is the lowest level, so less impact. So when it is lost, or neighborhood or town lose PV generation it will impact nearby station, which is couple MW if not kW. So when you lose PV generation and you planned your system for extreme case, higher level of generation or substation will take control of it.
Losing GW solar does not mean you're losing that amount power in small geographical region. You have to divide that into so many small parts. Also, PV generation at GW level is too high for small region.
Hope this explanation helps. It is because how power flows, governed by rules of physics. Bottom line, if hacker wants to affect a grid they should target higher level of grid, PV panels on the rooftops will not help their cause, they are end of line.
On top of that PVs installed at homes are insignificant to cause such troubles. As the size of installation increases, you will have different connection agreement and certain requirements. You can't install 15 MW and connect through inverters that are used at home, which is 100 kW at most. Even 15 MW is insignificant change for a grid.
Micro inverter for each panel would be very costly. In 1 MW plant you will have around 4000 panels, communicating with that amount electronic devices would be a headache.
Just to clarify and understand what happened, I believe right after the trip some generators all around the grid picked up the load (unless UFLS was activated) immediately (around 7:03), we can call these generators support system. Then around 7:05 batteries kicked in with 468 MW, as a support to support system.
Also your original post link states event happened at 7:02 AM, your links here points to 8:05 AM. Can you explain this?
With that said, turbines responding in couple minutes are more reliable as a baseline when you’re planning load flow of as big as country or wider area. The basic reason is that you have source of energy under your control such as nuclear, water, gas, coal. You cannot have solar, wind as your baseline, I don’t want sound dramatic, but it’s kind of suicidal to do that. Solar’s ramping is not a win when you consider greater scale.
Always thought calling car engine a motor is incorrect, shouldn’t be used interchangeably. In my experience machinery would be common name for both in engineering terms, not daily usage.