qchris
Joined 6 years ago
Joined 6 years ago
[1] https://www.cbsnews.com/baltimore/news/baltimore-city-reache...
Probably shouldn't have mentioned this publicly ;) Every time an Oxide post comes up, there's people in the comments expressing fervent wishes for just this sort of thing. Now that they know it exists, I imagine the the voices asking to make it available for developers and homelabs will grow even louder.
A big of the attraction of re-building this kind of foundational software isn't the base capability (commercial 3D CAD has barely even seen incremental improvements for more than a decade, in large part because it's just pretty well solved in the existing programs), but that a modern kernel would be a major step forward for unblocking implementation of some of those other capabilities.
Don't let that discourage you, though! A fast, local, fully-featured 3D parametric CAD program that takes advantage of modern hardware parallelism that can be extended/scripted is just basically one of the holy grails of software and even exploratory efforts might uncover some great paths forward to making that a reality!
[1] https://www.seangoedecke.com/they-really-do-think-ai-might-k...
I spent a little time working there around 2017. Whatever you're implying my former colleagues' thoughts on the subject are (or mine, for that matter), you're probably wrong.
> the illegal, unpermitted gas turbines they've been running at their Memphis Colossus data center
Illegal. These turbines are illegal. What xAI under Musk's direction is doing is illegal. A business that must break the law to be practical isn't a business, it's a criminal organization operating by hurting people (which is WHY it's illegal to run gas turbines like this), and both it and those running it must be held accountable.
You're arguing that it's fine to break the law if it would otherwise cost a business money. I don't accept that, and nobody else in this community should either.
The story of SpaceX is often that Musk tried to buy a rocket, got a price estimate, and did some first-principles evaluation of the materials and engineering costs he believed was involved that came out to be much less than the going price. He ended up (through fast-forward view doing a lot of work) being largely correct.
The data-centers-in-space in space thing does not work out from a first principles approach. The waste heat generated by chips and the cooling method available (ultimately, radiative cooling), and the structures required create those surfaces, would be orders-of-magnitude beyond what could reasonably compete with a terrestrial version with the same capacity. There's no "but launch costs are dropping" adjustment that can possibly make up for that. The physics involved are the blocker.
Starlink is actually a good counter-example of where the execution--building and coordinating satellites in volume--was the bottleneck, not the underlying physics of the networking and SpaceX was in a great position to capitalize with their engineering expertise and reduced launch costs. It's a totally different situation for the data center thing, though.
> Eighteen months ago, Elon Musk shocked the datacenter industry by building a 100,000-GPU cluster in four months. Multiple innovations enabled this incredible achievement, but the energy strategy was the most impressive.
> Again, clever firms like xAI have found remedies. Elon's AI Lab even pioneered a new site selection process - building at the border of two states to maximize the odds of getting a permit early!
The energy strategy was to completely and almost certainly illegally bypass permitting and ignore the Clean Air Act, at a tangible cost to the surrounding community by measurably increasing respiratory irritants like NOx in the air around these communities. Characterizing this harm as "clever" is wildly irresponsible, and it's wild that the word "illegal" doesn't appear in the article once, while at the same time handwaving the fact that permitting for local combustion-based generation (for these reasons!) is one of the main factors to pushing out timelines and increasing cost.
[1] https://time.com/7308925/elon-musk-memphis-ai-data-center/
[2] https://www.selc.org/news/resistance-against-elon-musks-xai-...
[3] https://naacp.org/articles/elon-musks-xai-threatened-lawsuit...
As a result, the question is more Framework vs. Dell or Lenovo, and that creates a much smaller gap in capability in the 13" form factor.
Billions of dollars in cost, run 24/7 with virtually no downtime during regular operations, in underground tunnels with circumferences in the tens of miles, and all throughout is actively-coordinated super conductors and beam collimation in a high-vacuum tube attached to absurdly complex, ultra-sensitive, massively-scaled instrumentation (not to mention the whole on-site data processing and storage facilities). Certainly open to bring convinced otherwise, but aside from ISS in pure cost, so far it's my understanding that those are the pinnacle of large-scale machines.