double0jimb0
Joined 12 years ago
Joined 12 years ago
But what got those engineers in the same room in the first place?
What got them in the same room in the first place was them being the only group of people (most likely) working on a specific piece of enabling technology that they believed would be rewarded by the market and adoption AND they needed to make a living in the mean time (getting paid to do that work.)
A patent is the best thing we’ve collectively come up with to allow said group / company to invest the time and money in advance to making that technology and wants to risk/trade 20 future years to collect profit on the work they do now.
If you don’t like the game, get better at it.
Other type is permanent change that persists year over year. Haven't lived here long enough to measure this. But if you pull more heat from the ground in the winter than you put back into it into summer (we use a water to air compressor for AC in summer), then yes, it can happen and does happen. Don't know if we are in this bucket yet.
Currently system is running 20% methanol to combat the 29degF EWT (entering water temp) in deep winter. House is in Zone 6a.
One thing I learned in researching all of this is that use of ground source over many years can move the bulk ground temp permanently. (House also has water-to-air water furnace for AC). If heat pulled from ground in winter is not sufficiently replaced by heat added during summer, can move bulk ground temp over time. (If densely packed residential ground loops ever became a thing, I think this is a real risk.). But I am not sure if we have this issue at our place, still in first year, not enough data points.
So I'm looking at a backup gas boiler to take load of the heatpump/ground loop (house has radiant heat).
And they are not quiet. 5-Ton water to water compressors are not quiet.
And the control system (HDX) and amount of expertise required to keep the thing running is a major barrier to getting low cost maintenance.
Maybe a 2026-designed system will work better and actually live up to the hype you talk about, but there are decades of poorly designed and discarded ground loop heat pumps that have "poisoned the well" if you will.
On the small CNC that will work with aluminum... There is a whole tradespace around how small of a feature you are trying to mill vs spindle speed vs machine stiffness & spindle runout. If you were to get something like a HASS you can sorta do it all, but when you get into the hobby stuff, you need to be very certain about what smaller set of machining limitations you will be dealing with and if they will still get you where you need to go. You need to work backwards from what actual tolerances you need to hold for the downstream thing to be able to work. (For instance, if you are making an aluminum mold, when you machine it, you will most likely be repositioning the work piece... if your machine isn't square enough so that when you flip the part on it's side or upside down, then do your next op, the part may not have been square to begin with, so now you have something that won't match the other thing you are trying to mate to.)
I build a 2'x5' 3 axis with ATC, starting from a CNCdepot concept and did my own control. I probably spend as much money on precision straight edges, levels, 90deg blocks, lapping tools, etc that were required to build a machine that could hold tolerances to 0.001", which is probably where you need to be landing to have molds that work.
I guess I am just trying to say it's a very big and ugly can of worms you are opening up.
Before buying anything, you might just want to try using firstcut/protolabs. They will machine the aluminum molds and mold the parts for you. Price per part is not going to be pretty, but it's going to be way less than spending thousands on machines that will never get you to where you want to go.
As for "desktop" molding, there is some startup now pushing their kludged together machine, maybe that is the one you are referencing. I'd stay far away from that thing. I think they were charging a couple $k for it, I feel like you need to be at 5x-10x that for anything reasonable. But at that point, the amount of power and infrastructure you need is well outside anything you'd want to put in your house or even garage. Don't really have a good answer for you here.
One thing to look at, if you are doing those model kits where like 20 parts are all in one flat sheet and you twist them to remove them, people are starting to make these on FDM 3D printers, which might be worth looking at. Now you can prototype and do production on the same machine, which at your stage, is the right place to be.
When very precision molds are made, what Noctua talks about in "multiple tuning iterations are required until the geometry, cooling, gating, and moulding parameters are perfectly stabilised" is the standard process for this type of stuff. (Gears, bottle caps, or any molds than make 8, 16, 32, 64, or 128x of the same part in one shot, require that you start with "steel safe" geometry, meaning you mold the first test parts, measure them, and then modify the mold (by cutting material AWAY, it's very hard, usually bad idea, to add steel back to a mold)).
You can do your best to determine what geometry is "steel safe", and all of this is baked upon having very good engineering understanding of what material you are molding (and using very expensive software like MoldFlow to simulate this).
Legos are made from ABS, there are decades of research and data on how ABS behaves in mold, it's relatively safe to use results from Moldflow and be pretty confident in it. Noctua is using LCP. LCP is very niche, and it sounds like they themselves are doing the research on moldability/warp/process effects. And while also being a company that produces things on timelines, the friction/side effect is that sometimes best guesses will fail and they have to start over with new molds (that's a 2 month hit usually) and months of testing. That is what they were trying so say.
I design glass-filled nylon and polycarbonate parts/assemblies with tolerances 1-5x higher than theirs. The 6-month delay they described is something I've lived through many times when we had to "cut new molds" because we couldn't salvage the first mold. (Advanced molds like these are $50k - $200k+). As a company/designer gets more experience with new materials and colorants (like their stuff with LCP), they will probably be able to hit end-goals on first try more often as they collect learnings from their failures.