Comment · 7 years ago
Generally bid that is not "technically complete" .i.e. does not demonstrate a real ability to undertake and complete the project can be rejected. There is some engineering discretion to this.
Comment · 7 years ago
Most large infrastructure projects have a large number of trades for a short amount of time Contractors have people,experience and equipment that would be cost prohibitive to maintain full time but can be relatively inexpensive when hired for just their needed duration.

The kinds of work that you describe fall more under maintenance and basic repair, which most public agencies have full time employees that perform that roles. For instance the NYC subway has signaling workers for a constant stream of signal work, track workers to maintain track and sign workers for endless lifecycle replacement of signs. New construction work, like tunnels and stations is done by contractors.

Comment · 8 years ago
The block chain has fundamentally reinvented the way startups fleece investors.
Comment · 8 years ago
There is a non-zero chance that May is replaced by a hard brexiter and they insist, by will of the referendum, that a hard brexit must occur. You can see UKIP bubbling back up in frustration.

When you consider what a soft brexit is, it's genuinely nothing of what leave wanted. The UK still doesn't have a solid border between itself and the EU because of the Good Friday Agreement, the UK still had to pay the EU and follow it's regulations and for all that it gets zero say in the EU legislature.

So there is a real chance of a hard brexit and it's going to be very messy.

Comment · 8 years ago
I don't know if this is helpful to you, but Walmart pharmacies have inexpensive insulin if you ask for it.
Comment · 8 years ago
Comment · 8 years ago
Okay, my bachelors was in civil engineering and I have worked in construction and engineering for just over two years now.

Most public projects today have generous structured incentives that are given to companies for meeting goals for time and budget. We work to these incentives.

Keep in mind that often you cannot be aware of the things that will go wrong until you actually do them. This happens in software development quite a bit.

I am not aware of any extensive private tunnel construction that has occurred without public financing inside of the U.S.

So here are the drawbacks to Musk's plan:

1. He may prioritize speed over safety, either unintentionally causing loss of life or limb because of construction practices or geotechnically destablize the foundations of the buildings and infrastructure that he's traveling under.

2. I firmly believe that it's going to cost far, far more than 1 billion. That leaves the chance of a big hole in the ground that may eventually fill with water.

Comment · 8 years ago
There is also the possibility that a poorly engineered or rushed tunnel could destablize the foundations of structures above.
Comment · 8 years ago
To clarify, I was talking about traditional subway construction and why changes in boring costs would not change that.
Comment · 8 years ago
A boring machine that could dig 10x as quickly (and hold all other desirable characteristics equal) would save tens of billion of dollars in infrastructure projects around the world and substantially increase the financial viability of tunneling globally. It would totally transform the sector, much more profitability and meaningfully than these tunnels will change transportation.
Comment · 8 years ago
If the Boring company could produce a reliable boring machine that dug at 10x speed, the boring machine would far far more valuable than these tunnels. It makes me think that the claims are exaggerated or misleading.
Comment · 8 years ago
If you have the kind of nice geotechnical conditions that permit the use of tunnel boring machines then tunneling isn't actually very expensive. What's killer is the cost of subway stations, which need to be dug out manually.
Comment · 8 years ago
If your goal was to cut costs and your largest single expense was boring, you would choose two 14' bores over a single 28' bore, because a 28' bore has a cross section twice as large as the combined cross section of two 14' bores and variable costs for boring are roughly based on cross sectional area

One of the only things that I can agree with Musk in regards to this project is that larger tunnels are more expensive.

Comment · 8 years ago
Building underground interchanges that include complete grade separation would entail building cloverleaf interchanges underground. Cloverleaf interchanges usually cost somewhere from 500 million USD to 2 billion USD above ground.
Comment · 8 years ago