Comment Comment by tzs They aren't keeping supply low.They have two massive DRAM fabs (56000 m^2 cleanroom size each) that they started construction on in 2022 and 2023 in Idaho, with production starting in 2027 and 2028. parent tzs 1 month ago
They have two massive DRAM fabs (56000 m^2 cleanroom size each) that they started construction on in 2022 and 2023 in Idaho, with production starting in 2027 and 2028.