We already have the "power pipes", from the power plants.
> Professionals are manufacturing and installing these at scale.
A couple of electricians doing 20kWh (average install size) once per day, with an individual inverter, gateways, etc. is not at scale, by any means of the word.
> Professionals are manufacturing and installing these at scale. A couple of electricians doing 20kWh (average install size) once per day, with an individual inverter, gateways, etc. is not at scale, by any means of the word.