Have you seen the demo's of "truck pack" batteries being removed from prime mover, transferred to charge station, replaced with already charged truck pack, all done with a mini fork lift?
It's a 15 minute roll in / roll out kind of turn around.
The game's not over and the big transport operators (eg: Rio Tinto mine fleets moving a billion tonne per annum, etc) are still doing the R&D pipeline and trialling pilots.
It's a 15 minute roll in / roll out kind of turn around.
The game's not over and the big transport operators (eg: Rio Tinto mine fleets moving a billion tonne per annum, etc) are still doing the R&D pipeline and trialling pilots.