Comment

Comment by ggm

The best time to try and fix this is 20 or 30 years ago, but absent a time machine, the next best time is now.

Either you feel this kind of construction process is national-strategic and you ignore the cost over imports, or not. If you don't regard this as a core competency which should be kept in the national register, then sure, buy the ships from other places. But, don't come whining when the national-strategic interest needs you to do things outside the commercial domain or under duress, or with restrictions of access to supply in those other places.

There is Autarky, and there is total dependency, and there is a massive road in-between. Right now, we're very far from Autarky and we're far too close to total dependency.

I might add that Australia is in pretty much the same boat (hah) and the shemozzle over the Tasmanian Ferries (ordered from Scandi, parked in Edinburgh because too big for their home port dockside tie-ups) is an exemplar. And there's a high speed double-hull "cat" style fabricator in Tassie, or at least there was.

In the immediate short term, buying hulls and laying them up might be wise. I sailed around Falmouth 30 years ago with a friend and indeed, a lot of big ships were laid up in the estuary and river mouth. Awesome sight in a small sailing boat.

parent ggm 11 months ago

Discussion

Live from the official Hacker News API

A modern reader for Hacker News · SvelteKit + Skeleton