> Not quite …
The cost of enhanced geothermal is roughly the exact same cost as nuclear … shares similar economics of a very very low OpEx to CapEx ratio.
It can’t be both not quire and the same.
All else being equal, a five billion dollar geothermal plant running at 50% has the same problem as a five billion dollar nuclear plant running at 50%: where’s my profit?
Sure, load following is trivial with geothermal, but nuclear generally isn’t trying to compete in that space, so we can discount the difference there.
It can’t be both not quire and the same.
All else being equal, a five billion dollar geothermal plant running at 50% has the same problem as a five billion dollar nuclear plant running at 50%: where’s my profit?
Sure, load following is trivial with geothermal, but nuclear generally isn’t trying to compete in that space, so we can discount the difference there.