>Superstructure is about the easiest and fastest part of residential construction.
I'm perpetually confused on that front - interior, especially drywall, is stupid labor and time intensive (have to wait for taped joints to dry). There should be huge econmomies of scale for prefab walls with electric and ducting built in, yet all we see is this sort of 3d printing stuff.
I'm perpetually confused on that front - interior, especially drywall, is stupid labor and time intensive (have to wait for taped joints to dry). There should be huge econmomies of scale for prefab walls with electric and ducting built in, yet all we see is this sort of 3d printing stuff.