So one ship will have to unload on one side and then another ship will have to pick up the cargo on the other end? So the shipping company has to have two ships, one on each side, and wait for the loading and unloading?
I'm sure smarter people than me have worked this out but it seems like this would take a lot longer than the canal (which only takes 8-10 hours vs 7 hours for this train plus load and unload). Granted ships without reservations have to wait 2-20 days to transit the canal right now, but I suspect wait times for cranes at each end of this rail would be about the same as canal wait times if not longer.
I'm sure smarter people than me have worked this out but it seems like this would take a lot longer than the canal (which only takes 8-10 hours vs 7 hours for this train plus load and unload). Granted ships without reservations have to wait 2-20 days to transit the canal right now, but I suspect wait times for cranes at each end of this rail would be about the same as canal wait times if not longer.
Maybe a shipping expert can chime in here?