Comment
Comment by h317
Not the topic poster, but speaking from the similar experience, the cost can be as low as $4,000 in China for the size of these parts. In USA/Canada it would start with a $60k minimum, and with a 6 month timeline instead of 1.
And 9 times out of ten, the local fab is making their moulds in China anyway.