Comment Comment by chris_va Drilling cost is usually estimated as ~depth^2.So, a 1km geothermal well? Break even, and you are limited to only a few places in the world.A 5km geothermal well (needed for broad power availability)? 25x the cost...So, sure, if you can get a 25x cost reduction in an already cutthroat industry, all power to you (no pun intended). parent chris_va 5 years ago
So, a 1km geothermal well? Break even, and you are limited to only a few places in the world.
A 5km geothermal well (needed for broad power availability)? 25x the cost...
So, sure, if you can get a 25x cost reduction in an already cutthroat industry, all power to you (no pun intended).