> Nuclear power plants built in the 1970’s used 40 metric tons of steel, and 190 cubic meters of concrete, for each megawatt of average capacity.

> Modern wind energy systems, with good wind conditions, take 460 metric tons of steel and 870 cubic meters of concrete per megawatt.

https://www.nextbigfuture.com/2007/07/constructing-lot-of-nu...

First source I found.

Wind turbine lifetimes are 20 to 25 years at the best.

I agree for solar panels, they don't need lots of concrete and only loose efficiency over time. But you would need lots of them + a complete power storage system behind. So the cost and material used to have a similar power output is still order of magnitude higher.