Comment

Comment by adventured

The last stage of building the thing (say there are four stages), which always seems to take me at least 50% of the total build time. That involves force-grinding my way through many of the things I enjoy the least, some of which I intentionally leave for the end. It involves a lot of small adjustments, going back over things I intentionally left half-baked as a stand-in, bug fixes (I include fixing UI & UX problems or flaws with that), trimming down unnecessary bloat in the CSS & JS, doing a double or triple check on security, double checking legal, double checking database performance (making sure there are no obvious bottlenecks), finalizing user guides (FAQs, etc etc), and doing a lot of full run-throughs on the product from initial sign-up onward. Also just generally trying to find aspects I can break in the system, simulating as a normal user. I dislike the time sink of all of that, even though it's necessary. My productivity drops considerably with my dislike of the process of pushing through the things I hate doing.

I built an auth system seven or eight years ago that I regularly evolve and reuse. That goes into place on the first day, with usually minor adjustments per project and it just works. Before that auth was always an annoying chore.

parent adventured 7 years ago

Discussion

Live from the official Hacker News API

A modern reader for Hacker News · SvelteKit + Skeleton