How does a dam like Hoover effect the flow rate of water down stream after filling the dam?
My assumption was that after the dam is filled the flow rate can be regulated very close to pre dam levels of at least 95% flow rate factoring in any losses due to evaporation.
My assumption was that after the dam is filled the flow rate can be regulated very close to pre dam levels of at least 95% flow rate factoring in any losses due to evaporation.