“While these projects will help build energy supply on the continent, the International Energy Agency has said sub-Saharan Africa needs to invest $300 billion in order to achieve universal electricity access by 2030.”

While that sounds like a lot of dosh – and it is – in the grand scheme of things the benefits would be unimaginably transformative.

Geek stats: https://ltwp.co.ke/ltwp-connected-to-grid/

  • Construction of 365 Wind Turbine Generators (WTGs), with a capacity of 850kW each, for a
    total project installed capacity of 310 MW connected via a 33kV collection grid to the substation;
  • Installation of 365 Step-up Transformers 0.69/33 kV per Unit;
  • Construction of a sectionalized 33kV Substation, Step-up Power Transformers 33/220(400) kV;
  • Installation of three Dynamic Reactive Power Compensation Systems (Statcoms);
  • Installation of a SCADA System;
  • Construction of the LTWP Accommodation Village, which houses 148 people;
  • Construction and maintenance of 130km of internal access roads; and,
  • Upgrading of 208km road from Laisamis to Sarima.